Skiavon Studio · Milan, Italy

Façade consultancy, from design intent to the factory floor.

Independent façade consultant working with architects, main contractors and specialist subcontractors across the UK and Europe. Eight years and more than £400M of commercial and residential envelope — including four Higher-Risk Buildings taken through Building Safety Act coordination.

8years in façade delivery,
UK and Italy
£400M+of envelope packages
coordinated
4Higher-Risk Buildings,
Gateway 2 submissions
2markets, two languages,
one point of contact
What I do

Six ways I get brought onto a project.

Engaged by the day or by deliverable, on a written scope. Most work starts as a single package review and grows from there.

01

Façade design review
& technical advisory

Buildability and coordination review of unitised and stick curtain walling, structural glazing, rainscreen and SFS, precast concrete and masonry systems. Design intent tested against detail, tolerance and installation sequence — before it reaches site.

02

Building Safety Act
& Golden Thread

Gateway 2 support for Higher-Risk Buildings: compliance tracking against Approved Documents, structuring of the evidence pack, and document control across Autodesk Construction Cloud, Aconex and Viewpoint.

03

BIM coordination
& modelling

Revit authoring and façade package coordination. Clash detection and resolution across the façade–structure–fire–MEP interfaces, with parametric studies in Rhino and Grasshopper where the geometry earns them.

04

Technical due diligence
& defect investigation

Independent assessment of an existing envelope package: what has been specified, what has been built, and where the gap sits. Second opinion on contractor proposals and remedial strategies.

05

Value engineering

Alternative technical solutions that reduce construction risk and cost without conceding performance or compliance — developed with the subcontractor rather than imposed on them, so they survive contact with the workshop.

06

Factory & site support

Mock-up witnessing, performance test attendance, factory inspection and installation verification, with photographic evidence and written reporting in English for the design team.

The Italian advantage

Forty-eight hours from your unit to the plant floor.

A large share of the curtain walling on UK projects is fabricated in northern Italy and continental Europe. Monitoring it from London costs a flight, a hotel and a week of a senior engineer's time — which is why, in practice, it often does not happen at all.

I am based in Milan, work natively with the Italian supply chain, and report in British English to your team. A factory visit becomes a day rate and a train ticket.

  • Factory inspection and mock-up witnessing across northern Italy and continental Europe, at short notice
  • Native Italian with the supply chain, British English documentation for the UK team — nothing lost at the interface
  • Same-week written reports with photographic evidence, issued in your document format
  • Italian VAT registration, invoicing in GBP or EUR, professional indemnity insurance in place
Selected projects

Envelope packages delivered.

Roles held within design and delivery teams prior to independent practice. Client, subcontractor and commercial identifiers are withheld; project names are a matter of public record.

Four New Bailey

Manchester, United Kingdom
Façade technical coordination on a large unitised curtain wall package: interface engineering, shop drawing review, tolerance and setting-out resolution, and installation sequencing with the specialist subcontractor. Unitised curtain wall · structural glazing
175,000 ft² envelope 1,200+ units RIBA 4–5

The Hundred

Birmingham, United Kingdom
Technical interface for the façade package between design team, main contractor and specialist subcontractors. Chaired façade workshops, resolved clashes across curtain wall, rainscreen, precast and Juliet balconies, and prepared technical documentation in support of the Gateway 2 submission. Precast with factory-fitted windows · rainscreen · stick curtain wall
33 storeys 135,000 ft² envelope RIBA 3–4 Gateway 2

The Hexagon

Leeds, United Kingdom
Façade technical coordination within the architect's team on a residential tower classified as a Higher-Risk Building under the Building Safety Act 2022, from design development through to compliance documentation. Unitised curtain wall · rainscreen cladding
44 storeys 108,000 ft² envelope RIBA 3–4 Gateway 2

Buchanan Wharf

Glasgow, United Kingdom
Envelope coordination across a large mixed-use development: package interfaces, buildability review and technical documentation within the delivery team. Unitised frames · stick curtain wall · rainscreen cladding
207,000 ft² envelope 1,230 units RIBA 4–5
How I work

Scope in writing,
before anything starts.

  • Priced by service, not by client. A day of Building Safety Act work and a day of BIM coordination are not the same day, and are not billed as one.
  • Day rate or fixed fee by deliverable. Half-day minimum. Travel billed at a full day plus expenses, agreed in advance.
  • Remote-first, with scheduled attendance. Design work from Milan; factory, mock-up and site attendance planned into the programme rather than improvised.
  • One person, named and accountable. No account manager, no handover to a junior after the pitch.
Credentials

Qualified,
insured, registered.

  • MSc Architecture and Urban Design — Politecnico di Milano
  • BSc Architettura — Politecnico di Milano
  • Registered business in Italy — Partita IVA, ATECO 74.99.99, building envelope consultant
  • Professional indemnity insurance in place
  • Published research — SDEWES International Conference, 2018

Standards worked to

Building Safety Act 2022 · Gateway 2 CWCT Standard BS EN 13830 BS 8200 Approved Document B
Get in touch

Tell me what the package is doing, and I will tell you whether I can help.

An initial conversation costs nothing and usually takes twenty minutes. If the work is not a fit, I will say so and, where I can, point you to someone it does fit.